Coming down the home stretch (for construction)

Posted on Categories Uncategorized

We’re rounding into the home stretch for construction! There are a couple of big(ger) things remaining:

  • We need to seal the brewery area concrete
  • The lights in the “snug” area should be in this week, as should the additional copper lights in the beerhall
  • The tankless water heaters haven’t arrived yet
  • The front rail on the bar is stripped, but not refinished
  • …and the big one: the chiller didn’t quite fit where we had hoped, so we’re working on (hopefully) putting it out back

But other than that, we’re mostly looking at little punchlist items. They did a bunch of cleanup over the weekend and this morning to get the construction debris out, and IMHO I think it’s looking incredible! I can’t wait to be able to look out over the bar at a lot of new and old friends enjoying our beer!

20151110_143421

View from the entranceway – Flooring and ceiling are all finished, paint and trim look great, and the lighting is pretty much set! From this angle (aside from the lack of beer taps, brewing equipment and furniture) we’re ready to open!

20151110_143453

View from the brewery – The concrete work in the beerhall is done, and the little lights above it really make it a festive little area. Prost!

20151110_143523

View from the bar – We just have to put the projector up and we’ll be ready to show sports and movies!

20151110_143545

View into the brewery – The brewery is just about ready for equipment! The back wall is our production board, and the left wall will be the community art gallery.

3 responses to “Coming down the home stretch (for construction)”

  1. John Lauerman says:

    Will you be serving food.

    • cmreigrut says:

      Hi, John! While we do have the space & hoods for a kitchen, we won’t be opening the kitchen for about a year. We need time to get the brewery down solid before we take that on, as well. However, we will have snacks available on-premises, depending on what the Health Department will allow us to do. We’re also partnering with the restaurants in the center (Winston Hill’s BBQ, Garlic Knot, Jade Garden, etc) to have menus available and they’ll deliver over to us. We’re also looking into partnering with some local food trucks, as well.

  2. Audrey Donovan says:

    Were excited for the opening! See you later today.